Upper Trishuli - 1

Nepal
Linked solutions
Water

Owner’s Engineer for Upper Trishuli - 1 Hydroelectric Power Plant

Upper Trishuli (UT) -1 is a 216 MW hydropower Project located 70 km north of Kathmandu to be implemented by the Nepal Water and Energy Development Co. Pvt. Ltd. Entity (NWEDC). NWEDC is a Special Purpose Vehicle through which KOEN (KOSEP) Co. Ltd., Daelim, Kyeryong, IFC (World Bank Group) and a local partner have been developing Upper Trishuli-1 (UT-1) Hydroelectric Project.

Client Nepal Water & Energy Development Company Pvt. Ltd. (NWEDC)
Location Rasuwa District, Nepal
Period Phase I & II: 2019 to 2021, Phase III: 2021 – Ongoing

Upper Trishuli-1 HEPP is a run-of-river type power plant on the Trishuli River. Its main features include the following structures and facilities:

Services provided

Phase-I Value Engineering Services:

Phase-II EPC Contract Award Services:

Phase-III Project Management and Supervision Services (in JV):

 

Linked subdomains

The linked subdomains are:
Large Hydropower Plants

Related references